Existing drainage pipe were excavated and replaced with new drainage run.
Due to the depth of excavation which was over 3m deep. We have used trench boxed and David arm system – for safe entry.
Project
DSV Purfleet – Drainage remedial Works
Client
Thomas Sinden Ltd
What We Did
Drainage | Excavation| Tarmac works